TECHNICAL DATA:
Mixing ratio: comp. A : comp. B = 4 : 1.
Colour of mix: white, grey (Ral 7001) and neutral.
Application temperature range: from +5°C to +30°C.
Workability time: 30-40 minutes.
Setting time of film: 4-5 hours.
Waiting time between first and second coat: 6-24 hours.
Final hardening time: 3 days.
Storage: 24 months in its original sealed packaging.
Application: brush, roller or airless spray.
Consumption: 400-600 g/m² per coat.
Packaging:
– 5 kg kits (A + B): neutral and grey; – 15 kg kits (A+B): neutral.
Mapecoat I24
Mapecoat I24
Mapecoat I24 Two-component epoxy paint for anti-acid coatings on concrete surfaces.